REYDSPackhouse & Cold Storage

Evapco · Gqeberha

Ripening Room Installation for Evapco Systems in Macadamia Processing | Deal Party

Pressurised ripening rooms with ethylene dosing and reverse airflow. We support Evapco evaporative condensers and cooling towers running R404A in macadamia processing across Deal Party and Deal Party Industrial.

Technical highlights

SAQCC Gas certified ripening room installation

SANS 10147 pressure and gas compliance, genuine Evapco OEM parts and rapid dispatch to Deal Party.

  • SAQCC Gas registered technicians handling R404A
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Evapco OEM parts — Evapco spray nozzles, drift eliminators, fan drives and water treatment kits
  • 6–10 weeks to Deal Party, Gqeberha

Common maintenance vectors

What we find on these systems

  • Airflow evenness across pallets
  • Ethylene dosing accuracy
  • CO₂ washout ventilation
  • Scale fouling on coil surfaces in hard-water regions
  • Fan bearing failure from continuous high-ambient duty
  • Blocked bleed lines raising conductivity and corrosion

Dynamic specifications

Macadamia Processing duty on Evapco plant

Dry-store climate control and kernel holding rooms

Typical system duty+8 °C to +15 °C (+13 °C to +20 °C pulp temperature)
Design humidity55–65% RH
Recommended gas / pressure classR404A — handled by SAQCC Gas registered technicians
Equipment platformEvapco Evaporative condensers and cooling towers — Closed-circuit coolers, evaporative condensers, industrial ammonia packages
Compliance frameworksHACCP, FSSC 22000, SANS 10147, SAQCC Gas registration
OEM parts heldEvapco spray nozzles, drift eliminators, fan drives and water treatment kits
Service deliverablePulp temperature uniformity report
Response / lead time6–10 weeks
Location hubServing Deal Party Industrial and surrounds off the N2 / M4

Local context

Working in Deal Party

We service Deal Party Industrial and the surrounding blocks of Deal Party, Gqeberha, with access off the N2 and M4. Coastal salt-laden air plus wide day-night temperature swings demand coated coils and tight vapour barriers.

Dehumidification-dominant load with low sensible duty Moisture pickup drives rancidity and kernel downgrade

Compliance

Documentation you receive

  • HACCP
  • FSSC 22000
  • SANS 10147
  • SAQCC Gas registration
  • Pulp temperature uniformity report

FAQ

Evapco ripening room installation in Deal Party

How fast can a technician service Evapco equipment at a macadamia processing site in Deal Party?

Deal Party sits on the N2 and M4, so our Gqeberha dispatch reaches most Deal Party Industrial sites inside a standard callout window. Emergency ripening room installation runs 24/7 because moisture pickup drives rancidity and kernel downgrade.

Do you stock OEM components for Evapco systems?

Yes — Evapco spray nozzles, drift eliminators, fan drives and water treatment kits. Evapco (USA) equipment on R404A charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every ripening room installation job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the HACCP documentation your auditors expect.

What operating envelope do you commission this equipment to?

Macadamia Processing run at +8 °C to +15 °C at 55–65% RH, with ripening room installation performed against +13 °C to +20 °C pulp temperature. Moisture pickup drives rancidity and kernel downgrade

Get started

Schedule an on-site diagnostic in Deal Party

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988