REYDSPackhouse & Cold Storage

Bock · Cape Town

Gas Recharge & Recovery for Bock Systems in Red Meat Abattoirs | Diep River

Recovery, evacuation and recharge to manufacturer charge weight by SAQCC-registered technicians. We support Bock open-drive and semi-hermetic compressors running R404A, R717 in red meat abattoirs across Diep River and Diep River Industrial.

Technical highlights

SAQCC Gas certified gas recharge & recovery

SANS 10147 pressure and gas compliance, genuine Bock OEM parts and rapid dispatch to Diep River.

  • SAQCC Gas registered technicians handling R404A, R717
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Bock OEM parts — Bock shaft seals, suction filters and gasket kits
  • Same-day attendance to Diep River, Cape Town

Common maintenance vectors

What we find on these systems

  • Non-condensables in the charge
  • Wet system after an open repair
  • Overcharge raising discharge pressure
  • Shaft seal weep on open-drive units
  • Belt misalignment on transport and skid packages
  • Suction strainer blockage after a burnout

Dynamic specifications

Red Meat Abattoirs duty on Bock plant

Carcass chillers, ageing rooms and freezer stores

Typical system duty−2 °C to +4 °C carcass chill (Charge weight per nameplate)
Design humidity85–90% RH
Recommended gas / pressure classR404A, R717 — handled by SAQCC Gas registered technicians
Equipment platformBock Open-drive and semi-hermetic compressors — HG/HA series semi-hermetic and FK open-drive transport compressors
Compliance frameworksHACCP, Meat Safety Act, SANS 10147, SAQCC Gas registration
OEM parts heldBock shaft seals, suction filters and gasket kits
Service deliverableGas handling record and Certificate of Conformance
Response / lead timeSame-day attendance
Location hubServing Diep River Industrial and surrounds off the M3 / M5

Local context

Working in Diep River

We service Diep River Industrial and the surrounding blocks of Diep River, Cape Town, with access off the M3 and M5. Mediterranean summers with strong south-easters carry dust and salt onto condenser coils, and winter rain drives condensation risk at dock openings.

Carcass chill pull-down within 24 hours of slaughter Cold shortening or drip loss from an incorrect chill curve

Compliance

Documentation you receive

  • HACCP
  • Meat Safety Act
  • SANS 10147
  • SAQCC Gas registration
  • Gas handling record and Certificate of Conformance

FAQ

Bock gas recharge & recovery in Diep River

How fast can a technician service Bock equipment at a red meat abattoirs site in Diep River?

Diep River sits on the M3 and M5, so our Cape Town dispatch reaches most Diep River Industrial sites inside a standard callout window. Emergency gas recharge & recovery runs 24/7 because cold shortening or drip loss from an incorrect chill curve.

Do you stock OEM components for Bock systems?

Yes — Bock shaft seals, suction filters and gasket kits. Bock (Germany) equipment on R404A/R717 charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every gas recharge & recovery job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the HACCP documentation your auditors expect.

What operating envelope do you commission this equipment to?

Red Meat Abattoirs run at −2 °C to +4 °C carcass chill at 85–90% RH, with gas recharge & recovery performed against Charge weight per nameplate. Cold shortening or drip loss from an incorrect chill curve

Get started

Schedule an on-site diagnostic in Diep River

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988