REYDSPackhouse & Cold Storage

Isocab · Cape Town

Controlled Atmosphere Installation for Isocab Systems in Potato & Onion Storage | Ndabeni

CA rooms with nitrogen generation, CO₂ scrubbing and gas-tight sealing. We support Isocab high-performance insulated panels and doors running R404A, R717 in potato & onion storage across Ndabeni and Ndabeni Industrial.

Technical highlights

SAQCC Gas certified controlled atmosphere installation

SANS 10147 pressure and gas compliance, genuine Isocab OEM parts and rapid dispatch to Ndabeni.

  • SAQCC Gas registered technicians handling R404A, R717
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Isocab OEM parts — Isocab panel joints, door sets and hygienic coving
  • 8–14 weeks to Ndabeni, Cape Town

Common maintenance vectors

What we find on these systems

  • Room gas-tightness
  • Scrubber capacity
  • Gas analyser calibration
  • Vapour barrier punctures leading to core wetting
  • Thermal bridging at unsealed floor junctions
  • Panel skin delamination after impact damage

Dynamic specifications

Potato & Onion Storage duty on Isocab plant

Bulk stores with plenum ventilation and humidity control

Typical system duty+4 °C to +10 °C (1–3% O₂, 0–5% CO₂ at −0.5 °C to +2 °C)
Design humidity85–95% RH
Recommended gas / pressure classR404A, R717 — handled by SAQCC Gas registered technicians
Equipment platformIsocab High-performance insulated panels and doors — PIR and PUR panel systems with fire-rated cores
Compliance frameworksGLOBALG.A.P., HACCP, SANS 10147, SAQCC Gas registration
OEM parts heldIsocab panel joints, door sets and hygienic coving
Service deliverablePressure decay test and gas analysis record
Response / lead time8–14 weeks
Location hubServing Ndabeni Industrial and surrounds off the N2 / M5

Local context

Working in Ndabeni

We service Ndabeni Industrial and the surrounding blocks of Ndabeni, Cape Town, with access off the N2 and M5. Mediterranean summers with strong south-easters carry dust and salt onto condenser coils, and winter rain drives condensation risk at dock openings.

Bulk-bin ventilation with sprout-inhibitor cycles Condensation on bins causes rot spread through the stack

Compliance

Documentation you receive

  • GLOBALG.A.P.
  • HACCP
  • SANS 10147
  • SAQCC Gas registration
  • Pressure decay test and gas analysis record

FAQ

Isocab controlled atmosphere installation in Ndabeni

How fast can a technician service Isocab equipment at a potato & onion storage site in Ndabeni?

Ndabeni sits on the N2 and M5, so our Cape Town dispatch reaches most Ndabeni Industrial sites inside a standard callout window. Emergency controlled atmosphere installation runs 24/7 because condensation on bins causes rot spread through the stack.

Do you stock OEM components for Isocab systems?

Yes — Isocab panel joints, door sets and hygienic coving. Isocab (Belgium) equipment on R404A/R717 charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every controlled atmosphere installation job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the GLOBALG.A.P. documentation your auditors expect.

What operating envelope do you commission this equipment to?

Potato & Onion Storage run at +4 °C to +10 °C at 85–95% RH, with controlled atmosphere installation performed against 1–3% O₂, 0–5% CO₂ at −0.5 °C to +2 °C. Condensation on bins causes rot spread through the stack

Get started

Schedule an on-site diagnostic in Ndabeni

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988