REYDSPackhouse & Cold Storage

Isocab · Bloemfontein

Controlled Atmosphere Installation for Isocab Systems in Potato & Onion Storage | Estoire

CA rooms with nitrogen generation, CO₂ scrubbing and gas-tight sealing. We support Isocab high-performance insulated panels and doors running R404A, R717 in potato & onion storage across Estoire and Estoire Industrial.

Technical highlights

SAQCC Gas certified controlled atmosphere installation

SANS 10147 pressure and gas compliance, genuine Isocab OEM parts and rapid dispatch to Estoire.

  • SAQCC Gas registered technicians handling R404A, R717
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Isocab OEM parts — Isocab panel joints, door sets and hygienic coving
  • 8–14 weeks to Estoire, Bloemfontein

Common maintenance vectors

What we find on these systems

  • Room gas-tightness
  • Scrubber capacity
  • Gas analyser calibration
  • Vapour barrier punctures leading to core wetting
  • Thermal bridging at unsealed floor junctions
  • Panel skin delamination after impact damage

Dynamic specifications

Potato & Onion Storage duty on Isocab plant

Bulk stores with plenum ventilation and humidity control

Typical system duty+4 °C to +10 °C (1–3% O₂, 0–5% CO₂ at −0.5 °C to +2 °C)
Design humidity85–95% RH
Recommended gas / pressure classR404A, R717 — handled by SAQCC Gas registered technicians
Equipment platformIsocab High-performance insulated panels and doors — PIR and PUR panel systems with fire-rated cores
Compliance frameworksGLOBALG.A.P., HACCP, SANS 10147, SAQCC Gas registration
OEM parts heldIsocab panel joints, door sets and hygienic coving
Service deliverablePressure decay test and gas analysis record
Response / lead time8–14 weeks
Location hubServing Estoire Industrial and surrounds off the N1 / N8

Local context

Working in Estoire

We service Estoire Industrial and the surrounding blocks of Estoire, Bloemfontein, with access off the N1 and N8. Dry heat by day and sharp frost by night stress door heaters, oil viscosity and defrost timing in equal measure.

Bulk-bin ventilation with sprout-inhibitor cycles Condensation on bins causes rot spread through the stack

Compliance

Documentation you receive

  • GLOBALG.A.P.
  • HACCP
  • SANS 10147
  • SAQCC Gas registration
  • Pressure decay test and gas analysis record

FAQ

Isocab controlled atmosphere installation in Estoire

How fast can a technician service Isocab equipment at a potato & onion storage site in Estoire?

Estoire sits on the N1 and N8, so our Bloemfontein dispatch reaches most Estoire Industrial sites inside a standard callout window. Emergency controlled atmosphere installation runs 24/7 because condensation on bins causes rot spread through the stack.

Do you stock OEM components for Isocab systems?

Yes — Isocab panel joints, door sets and hygienic coving. Isocab (Belgium) equipment on R404A/R717 charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every controlled atmosphere installation job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the GLOBALG.A.P. documentation your auditors expect.

What operating envelope do you commission this equipment to?

Potato & Onion Storage run at +4 °C to +10 °C at 85–95% RH, with controlled atmosphere installation performed against 1–3% O₂, 0–5% CO₂ at −0.5 °C to +2 °C. Condensation on bins causes rot spread through the stack

Get started

Schedule an on-site diagnostic in Estoire

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988