Controlled Atmosphere Installation in Kathu Industrial
CA rooms with nitrogen generation, CO₂ scrubbing and gas-tight sealing. We cover Kathu Industrial off the N14 and R380.
Scope
Service detail
Extreme summer ambients above 40 °C mean condensers, gas charge and high-pressure protection must be specified for worst-case, not average, days.
| Discipline | envelope |
|---|---|
| Design duty | 1–3% O₂, 0–5% CO₂ at −0.5 °C to +2 °C |
| Deliverable | Pressure decay test and gas analysis record |
| Turnaround | 8–14 weeks |
| Typical findings | Room gas-tightness; Scrubber capacity; Gas analyser calibration |
| Coverage | Kathu Industrial, Kathu — N14 / R380 |
By industry & brand
Controlled Atmosphere Installation specialisations in Kathu Industrial
- Evapco — Citrus Packhouses
- Isocab — Citrus Packhouses
- Evapco — Table Grape Packhouses
- Isocab — Table Grape Packhouses
- Evapco — Avocado Packhouses
- Isocab — Avocado Packhouses
- Kide — Macadamia Processing
- Evapco — Macadamia Processing
- Evapco — Deciduous Fruit Packhouses
- Isocab — Deciduous Fruit Packhouses
- Kide — Banana Ripening Facilities
- Evapco — Banana Ripening Facilities
- Evapco — Potato & Onion Storage
- Isocab — Potato & Onion Storage
- Kide — Flower & Floristry Coolers
- Evapco — Poultry Processing Abattoirs
- Isocab — Poultry Processing Abattoirs
- Evapco — Red Meat Abattoirs
- Isocab — Red Meat Abattoirs
- Kide — Meat Wholesalers & Butcheries
- Evapco — Meat Wholesalers & Butcheries
- Evapco — Seafood Processing & Fisheries
- Isocab — Seafood Processing & Fisheries
- Evapco — Game & Venison Processing
- Isocab — Game & Venison Processing
- Evapco — Food Manufacturing Plants
- Isocab — Food Manufacturing Plants
- Kide — Bakery & Dough Retarding
- Evapco — Bakery & Dough Retarding
- Kide — Grain & Seed Storage
- Evapco — Grain & Seed Storage
- Kide — Cannabis Cultivation & Drying
- Kide — Mortuary & Forensic Refrigeration
- Evapco — Mortuary & Forensic Refrigeration
- Evapco — Chemical & Industrial Process Cooling
- Isocab — Chemical & Industrial Process Cooling
- Evapco — Data Centre & Critical Cooling
- Isocab — Data Centre & Critical Cooling
- Evapco — Mining & Bulk Air Cooling
- Isocab — Mining & Bulk Air Cooling
FAQ
Controlled Atmosphere Installation in Kathu Industrial
How quickly can Reyds attend Kathu Industrial?
Our technicians route to Kathu Industrial via the N14 and R380, with 8–14 weeks on controlled atmosphere installation and 24/7 breakdown cover for critical plant.
What does the job hand over?
Pressure decay test and gas analysis record, plus a SANS 10147 gas handling Certificate of Conformance issued by a SAQCC Gas registered technician.
Nearby zones
- Controlled Atmosphere Installation — Kimberley Industrial
- Controlled Atmosphere Installation — Upington Industrial
- Controlled Atmosphere Installation — Kakamas Industrial
- Controlled Atmosphere Installation — Keimoes Industrial
- Controlled Atmosphere Installation — Springbok Industrial
- Controlled Atmosphere Installation — De Aar Industrial
Get started
Request a quote or site assessment
Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.
- Phone / WhatsApp
- 069 268 0988
- info@reyds.co.za
- Workshop
- 386 Eeufees Street, Pretoria North, Gauteng
- Hours
- Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.