REYDSPackhouse & Cold Storage

Bock · Kempton Park

Compressor Overhaul for Bock Systems in Port & Export Cold Terminals | Chloorkop

Full compressor rebuild including valve plates, bearings, seals and oil system. We support Bock open-drive and semi-hermetic compressors running R717, R744 in port & export cold terminals across Chloorkop and Chloorkop Industrial.

Technical highlights

SAQCC Gas certified compressor overhaul

SANS 10147 pressure and gas compliance, genuine Bock OEM parts and rapid dispatch to Chloorkop.

  • SAQCC Gas registered technicians handling R717, R744
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Bock OEM parts — Bock shaft seals, suction filters and gasket kits
  • Workshop turnaround 3–7 days to Chloorkop, Kempton Park

Common maintenance vectors

What we find on these systems

  • Valve plate and gasket renewal
  • Bearing and shaft seal replacement
  • Oil analysis and acid testing
  • Shaft seal weep on open-drive units
  • Belt misalignment on transport and skid packages
  • Suction strainer blockage after a burnout

Dynamic specifications

Port & Export Cold Terminals duty on Bock plant

Reefer plug points, cold treatment holding and dock chill

Typical system duty−25 °C to +2 °C (−45 °C to +12 °C evaporating)
Design humidity85–95% RH
Recommended gas / pressure classR717, R744 — handled by SAQCC Gas registered technicians
Equipment platformBock Open-drive and semi-hermetic compressors — HG/HA series semi-hermetic and FK open-drive transport compressors
Compliance frameworksPPECB, SANS 10147, HACCP, SAQCC Gas registration
OEM parts heldBock shaft seals, suction filters and gasket kits
Service deliverableRebuild certificate with run-test data
Response / lead timeWorkshop turnaround 3–7 days
Location hubServing Chloorkop Industrial and surrounds off the R21 / N3

Local context

Working in Chloorkop

We service Chloorkop Industrial and the surrounding blocks of Chloorkop, Kempton Park, with access off the R21 and N3. Highveld summers push afternoon ambients past 32 °C with heavy thunderstorm humidity, so condensers here are sized with a generous approach and cleaned before every summer.

Container plug points plus surge holding around vessel windows Missed vessel windows on temperature-out-of-spec loads

Compliance

Documentation you receive

  • PPECB
  • SANS 10147
  • HACCP
  • SAQCC Gas registration
  • Rebuild certificate with run-test data

FAQ

Bock compressor overhaul in Chloorkop

How fast can a technician service Bock equipment at a port & export cold terminals site in Chloorkop?

Chloorkop sits on the R21 and N3, so our Kempton Park dispatch reaches most Chloorkop Industrial sites inside a standard callout window. Emergency compressor overhaul runs 24/7 because missed vessel windows on temperature-out-of-spec loads.

Do you stock OEM components for Bock systems?

Yes — Bock shaft seals, suction filters and gasket kits. Bock (Germany) equipment on R717/R744 charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every compressor overhaul job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the PPECB documentation your auditors expect.

What operating envelope do you commission this equipment to?

Port & Export Cold Terminals run at −25 °C to +2 °C at 85–95% RH, with compressor overhaul performed against −45 °C to +12 °C evaporating. Missed vessel windows on temperature-out-of-spec loads

Get started

Schedule an on-site diagnostic in Chloorkop

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988