REYDSPackhouse & Cold Storage

Frascold · Benoni

Compressor Overhaul for Frascold Systems in Cheese Maturation Rooms | Apex

Full compressor rebuild including valve plates, bearings, seals and oil system. We support Frascold semi-hermetic compressors and racks running R134a, R449A in cheese maturation rooms across Apex and Apex Industrial.

Technical highlights

SAQCC Gas certified compressor overhaul

SANS 10147 pressure and gas compliance, genuine Frascold OEM parts and rapid dispatch to Apex.

  • SAQCC Gas registered technicians handling R134a, R449A
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Frascold OEM parts — Frascold gasket sets, oil separators and capacity control valves
  • Workshop turnaround 3–7 days to Apex, Benoni

Common maintenance vectors

What we find on these systems

  • Valve plate and gasket renewal
  • Bearing and shaft seal replacement
  • Oil analysis and acid testing
  • Unloader solenoid sticking on part-load racks
  • Oil return failure on long suction runs
  • High-side leaks on transcritical CO₂ joints

Dynamic specifications

Cheese Maturation Rooms duty on Frascold plant

Maturation caves, brining rooms and dispatch chillers

Typical system duty+8 °C to +14 °C (−45 °C to +12 °C evaporating)
Design humidity80–90% RH
Recommended gas / pressure classR134a, R449A — handled by SAQCC Gas registered technicians
Equipment platformFrascold Semi-hermetic compressors and racks — A/D/Q series semi-hermetics with CO₂ transcritical variants
Compliance frameworksHACCP, R638, SANS 10147, SAQCC Gas registration
OEM parts heldFrascold gasket sets, oil separators and capacity control valves
Service deliverableRebuild certificate with run-test data
Response / lead timeWorkshop turnaround 3–7 days
Location hubServing Apex Industrial and surrounds off the N12 / R23

Local context

Working in Apex

We service Apex Industrial and the surrounding blocks of Apex, Benoni, with access off the N12 and R23. Highveld summers push afternoon ambients past 32 °C with heavy thunderstorm humidity, so condensers here are sized with a generous approach and cleaned before every summer.

Tight humidity band with low airflow velocity Humidity swings crack rinds and stall ripening

Compliance

Documentation you receive

  • HACCP
  • R638
  • SANS 10147
  • SAQCC Gas registration
  • Rebuild certificate with run-test data

FAQ

Frascold compressor overhaul in Apex

How fast can a technician service Frascold equipment at a cheese maturation rooms site in Apex?

Apex sits on the N12 and R23, so our Benoni dispatch reaches most Apex Industrial sites inside a standard callout window. Emergency compressor overhaul runs 24/7 because humidity swings crack rinds and stall ripening.

Do you stock OEM components for Frascold systems?

Yes — Frascold gasket sets, oil separators and capacity control valves. Frascold (Italy) equipment on R134a/R449A charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every compressor overhaul job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the HACCP documentation your auditors expect.

What operating envelope do you commission this equipment to?

Cheese Maturation Rooms run at +8 °C to +14 °C at 80–90% RH, with compressor overhaul performed against −45 °C to +12 °C evaporating. Humidity swings crack rinds and stall ripening

Get started

Schedule an on-site diagnostic in Apex

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988