Insulated panel cold rooms built, sealed and commissioned as one contract. We support Evapco evaporative condensers and cooling towers running R717, R744 in port & export cold terminals across Jacobs and Jacobs Industrial.

Technical highlights

SAQCC Gas certified cold room construction

SANS 10147 pressure and gas compliance, genuine Evapco OEM parts and rapid dispatch to Jacobs.

  • SAQCC Gas registered technicians handling R717, R744
  • SANS 10147 pressure vessel and installation compliance
  • Genuine Evapco OEM parts — Evapco spray nozzles, drift eliminators, fan drives and water treatment kits
  • 3–6 weeks per room to Jacobs, Durban

Common maintenance vectors

What we find on these systems

  • Panel joint sealing
  • Vapour barrier continuity
  • Floor junction thermal bridging
  • Scale fouling on coil surfaces in hard-water regions
  • Fan bearing failure from continuous high-ambient duty
  • Blocked bleed lines raising conductivity and corrosion

Dynamic specifications

Port & Export Cold Terminals duty on Evapco plant

Reefer plug points, cold treatment holding and dock chill

Typical system duty−25 °C to +2 °C (−2 °C to +12 °C room design)
Design humidity85–95% RH
Recommended gas / pressure classR717, R744 — handled by SAQCC Gas registered technicians
Equipment platformEvapco Evaporative condensers and cooling towers — Closed-circuit coolers, evaporative condensers, industrial ammonia packages
Compliance frameworksPPECB, SANS 10147, HACCP, SAQCC Gas registration
OEM parts heldEvapco spray nozzles, drift eliminators, fan drives and water treatment kits
Service deliverableHeat load calculation and commissioning report
Response / lead time3–6 weeks per room
Location hubServing Jacobs Industrial and surrounds off the N2 / M4

Local context

Working in Jacobs

We service Jacobs Industrial and the surrounding blocks of Jacobs, Durban, with access off the N2 and M4. Sub-tropical coastal humidity keeps wet-bulb temperatures high year-round, which raises evaporative condenser duty and accelerates coil corrosion.

Container plug points plus surge holding around vessel windows Missed vessel windows on temperature-out-of-spec loads

Compliance

Documentation you receive

  • PPECB
  • SANS 10147
  • HACCP
  • SAQCC Gas registration
  • Heat load calculation and commissioning report

FAQ

Evapco cold room construction in Jacobs

How fast can a technician service Evapco equipment at a port & export cold terminals site in Jacobs?

Jacobs sits on the N2 and M4, so our Durban dispatch reaches most Jacobs Industrial sites inside a standard callout window. Emergency cold room construction runs 24/7 because missed vessel windows on temperature-out-of-spec loads.

Do you stock OEM components for Evapco systems?

Yes — Evapco spray nozzles, drift eliminators, fan drives and water treatment kits. Evapco (USA) equipment on R717/R744 charges is supported with the fast-moving spares held at our Pretoria North workshop and non-stock items brought in on OEM order.

What pressure testing and gas compliance certificates are provided?

Every cold room construction job closes with a pressure test record and gas handling Certificate of Conformance issued under SANS 10147 by a SAQCC Gas registered technician, plus the PPECB documentation your auditors expect.

What operating envelope do you commission this equipment to?

Port & Export Cold Terminals run at −25 °C to +2 °C at 85–95% RH, with cold room construction performed against −2 °C to +12 °C room design. Missed vessel windows on temperature-out-of-spec loads

Get started

Schedule an on-site diagnostic in Jacobs

Tell us what you need cooled and where. We respond with a scoped quote, and for emergencies we dispatch straight away.

Phone / WhatsApp
069 268 0988
Email
info@reyds.co.za
Workshop
386 Eeufees Street, Pretoria North, Gauteng
Hours
Mon–Fri 07:00–17:00, Sat 08:00–13:00. 24/7 emergency breakdown line.
CallWhatsAppGet Quote069 268 0988